What is the difference between an RCD and an MCB? +
An MCB (Miniature Circuit Breaker) protects against overcurrent and short circuits — it is the modern equivalent of a fuse. An RCD (Residual Current Device) protects against earth leakage, which is what can kill you if you touch a live wire. Modern consumer units use RCBOs, which combine both functions into a single device per circuit, giving you the best protection. If your consumer unit still has rewirable fuses, it is overdue for an upgrade.
How often should I have my electrics inspected? +
The IET Wiring Regulations recommend an electrical inspection (EICR) every 10 years for owner-occupied homes, every 5 years for rented properties (this is a legal requirement for landlords), and every 5 years for commercial premises. If your home was built before 1980 or has never been inspected, it is worth booking an EICR sooner. The inspection will identify any deteriorated wiring, missing earthing, or outdated components.
What is Part P and why does it matter? +
Part P of the Building Regulations covers electrical safety in dwellings. Certain types of electrical work — including new circuits, consumer unit replacements, and work in bathrooms or kitchens — are classed as notifiable and must either be carried out by a Part P registered electrician or inspected by building control. Using a registered electrician saves you the building control fee (typically £200–£300) and ensures the work is properly certified.
What should I do if I have a complete power cut in Bannfoot? +
First, check whether your neighbours also have no power — if so, it is likely a supply fault and you should call your local distribution network operator (DNO), not an electrician. If it is only your property, check your consumer unit for tripped switches. If the main switch will not stay on, or keeps tripping immediately, do not keep resetting it — call an emergency electrician in Bannfoot as there may be a serious fault on one of your circuits.
Do I get a certificate after electrical work is completed? +
Yes — for any notifiable electrical work (new circuits, consumer unit replacements, bathroom/kitchen installations), your electrician must issue an Electrical Installation Certificate and notify your local building control. For smaller jobs like replacing a socket or light fitting, you should receive a Minor Electrical Installation Works Certificate. Keep these certificates safe as you will need them when selling your property.
How long does a consumer unit replacement take? +
A consumer unit replacement in Bannfoot usually takes 4 to 8 hours, depending on the number of circuits and the condition of the existing wiring. Your electricity supply will be off for most of this time, so plan accordingly — charge phones, fill flasks, and move any frozen food to a cool bag. The electrician will test every circuit before restoring power.